Advertisement

Communicating Product Recovery Activities

Processes, Objectives and Performance Measures
  • Geraldo Ferrer
  • D. Clay Whybark
Chapter

Abstract

This chapter aggregates and clarifies various expressions in the product recovery literature. In some instances, practitioners and researchers have used these expressions with conflicting meanings. We intend to facilitate communication by establishing a common usage for the product recovery vocabulary.

Keywords

Recovery Process Reverse Logistics Recycling Process Product Recovery Corporate Environmental Responsibility 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Ayres, R. U., et al. (1997). “Eco-Efficiency, Asset Recovery and Remanufacturing.” European Management Journal 15: 5, 557–574.CrossRefGoogle Scholar
  2. Biddle, D. (1993). “Recycling for profit: The new green business frontier.” Harvard Business Review November-December 1993, 145–156.Google Scholar
  3. Das, S., et al. (1995). “Automobile Recycling in the United States: Energy Impacts and Waste Generation.” Resources, Conservation and Recycling 14: 265–284.CrossRefGoogle Scholar
  4. Dillon, P.S. (1994). “Salvageability by Design.” IEEE Spectrum August 1994, 18–21.Google Scholar
  5. EPA. (1993). “Life Cycle Guidance Manual: Environmental Requirements and the Product System.” U.S. Environmental Protection Agency, Offie of Research and Development, Report EPA600/R-92/226, January 1993,Google Scholar
  6. Ferrer, G. (1996). “On the Economics of Remanufacturing a Widget.” INSEADCMER, Working paper 96/64/TM, Fontainebleau, France.Google Scholar
  7. Ferrer, G. (1997a). “The Economics of Tire Remanufactiring.” Resowrces, Conservation and Recycling 19: 221–255.CrossRefGoogle Scholar
  8. Ferrer, G. (1997b). Managing the Recovery of Value from Durable Products. Ph.D. dissertation, Technology Management Area, INSEAD, Fontainebleau, France.Google Scholar
  9. Fisher, A. (1991). “Reincarnation in the design studio.” In Financial Times, London, UK, 3 Apr 91, pp. 29.Google Scholar
  10. Fleischmann, M., et al. (1997). “Quantitative models for reverse logistics: A review.” European Journal of Operational Research 103: 1–17.CrossRefGoogle Scholar
  11. Graedel, T. E.; and Allenby, B. R. (1995). Industrial Ecology, Upper Saddle River, NJ: Prentice-Hall.Google Scholar
  12. Guide, V. D. R., Jr. (1996). “Scheduling Using Drum-BufFer-Rope in a Remanufacturing Environment.” International Journal of Production Research 34:4, 1081–1091.CrossRefGoogle Scholar
  13. Guide, V. D. R., Jr., et al. (1997). “Scheduling Policies for Remanufacturing.” International Journal of Production Economics 48: 187–204.CrossRefGoogle Scholar
  14. Guide, V. D. R., Jr.; and Spencer, M. S. (1995). “Rough-cut Capacity Planning for Remanufacturing Firms.” Production Planning & Control Google Scholar
  15. Gupta, S. M.; and Taleb, K. N. (1994). “Scheduling Disassembly.” International Journal of Production Research 32: 8, 1857–1866.CrossRefGoogle Scholar
  16. Hart, S. L. (1995). “A Natural-Resource-Based View of the Firm.” Academy of Management Review 20: 4, 986–1014.Google Scholar
  17. Heijungs, R., et al. (1996). Life Cycle Assessment: What It Is and How to Do It, Paris, France: United Nations Environment Programme.Google Scholar
  18. Horvath, A., et al. (1995). “Performance Measurement for Environmentally Conscious Manufacturing.” In Manufacturing Science and Engineering ASME 1995, pp. 855–860.Google Scholar
  19. Jardine, A. K. S.; and Hassounah, M. I. (1990). “An Optimal Vehicle-fleet Inspection Schedule.” Journal of the Operational Research Society 41:9, 791–799.Google Scholar
  20. Johnson, M. R.; and Wang, M. H. (1995). “Planning product disassembly for material recovery opportunitiçs.” International Journal of Production Research 33: 11, 3119–3142.CrossRefGoogle Scholar
  21. Kriwet, A., et al. (1995). “Systematic Integration of Design-for-Recycling into Product Design.” International Journal of Production Economics 38: 15–22.CrossRefGoogle Scholar
  22. Kroll, E., et al. (1996). “A methodology to evaluate ease of disassembly for product recycling.” HE Transactions 28: 837–845.Google Scholar
  23. Lund, R. T. (1984). “Remanufacturing.” In Technology Review, February/March 1984, pp. 19–29.Google Scholar
  24. McConocha, D. M.; and Speh, T. W. (1991). “Remarketing: Commercialization of remanufacturing technology.” The Journal of Business and Industrial Marketing6: 1–2, 23–37.Google Scholar
  25. OTA. (1992). “Green Products by Design, Choices for a Cleaner Environment.” Office of Technology Assessment, Congress of the United States,Google Scholar
  26. Owen, J. V. (1993). “Environmentally conscious manufacturing.” In Manufacturing Engineering, No. 4, Oct 93, pp. 44–55.Google Scholar
  27. Panisset, B. D. (1988). “MRP II for Repair/Refurbish Industries.” Production and Inventory Management Journal Fourth Quarter, 1988, 12–15.Google Scholar
  28. Penev, K. D.; and de Ron, A. J. (1994). “Development of disassembly line for refrigerators.” In Industrial Engineering, November 94, pp. 50–53.Google Scholar
  29. Penev, K. D.; and de Ron, A. J. (1996). “Determination of a disasembly strategy.” International Journal of Production Research 34: 2, 495–506.CrossRefGoogle Scholar
  30. Purser, R. E., et al. (1995). “Limits to Anthropocentrism: Toward and Ecocentric Organisation Paradigm?” Academy of Management Review 20: 4, 1053–1090.Google Scholar
  31. Sherbrooke, C. C. (1968). “METRIC: A Multi-Echelon Technique for Recoverable Item Control.” Operations Research 16: 1, 122–141.CrossRefGoogle Scholar
  32. Sprow, E. (1992). “The Mechanics of Remanufacturing.” InManufacturing Engineering, No. 3, March 92, pp. 38–45.Google Scholar
  33. Stauffer, R. N. (1990). “Making the right moves in machine make-over.” InManufacturing Engineering, No. 3, March 90, pp. 49–53.Google Scholar
  34. Thierry, M., et al. (1995). “Strategic Issues in Product Recovery Management.” California Management Review 37: 2 — Winter 1995, 114–135.CrossRefGoogle Scholar
  35. Toensmeier, P. A (1992). “Remanufacture does more than save on investment.” In Modern Plastics, April 92, pp. 77–79.Google Scholar
  36. Van der merwe, S.; and Oliff, M. D. (1991). “Corporate challenges for an age of reconsumption.” The Columbia Journal of World Business Fall 1991, 6–25.Google Scholar
  37. Venta, E. R.; and Wolsky, A. M. (1978). “Energy and Labor Cost for Gasoline Engine Remanufacturing.” Argonne National Laboratory, September 1978, Argonne, IL.Google Scholar

Copyright information

© Springer Science+Business Media New York 2001

Authors and Affiliations

  • Geraldo Ferrer
    • 1
  • D. Clay Whybark
    • 1
  1. 1.The Kenan-Flagler Business SchoolThe University of North Carolina at Chapel HillUSA

Personalised recommendations